West on Murray Apartments

14095 SW Walker Rd. 

Beaverton, OR 97005

 West on Murray Apartments had always been a vibrant place for its residents, but some of the units were in desperate need of a refresh. Outdated kitchens, worn carpets, and tired bathrooms didn’t reflect the inviting community that West on Murray wanted to be. The apartments needed a makeover to create modern, comfortable homes that residents could be proud of.

 That’s when Currin Construction stepped in as a trusted guide. With their expertise, they designed a plan to bring new life to these units. Kitchens were completely transformed, with old appliances and laminate countertops replaced by sleek, modern finishes. New quartz counters, stainless steel appliances, and open shelving created a clean, bright look. Bathrooms were overhauled, trading outdated tiles for elegant, neutral tones that added both style and durability.

 Throughout the units, Currin Construction replaced old carpets with durable LBP vinyl flooring, giving each space a fresh, contemporary feel. The team also updated lighting, doors, and finishes to ensure that every detail matched today’s design standards. A fresh coat of paint tied everything together, creating spaces that felt both modern and inviting.

 When the work was done, the difference was remarkable. Residents now had homes that felt brand new, reflecting the care and thoughtfulness of the West on Murray community. These updated units don’t just look better—they’re ready to welcome a new generation of residents to a place they can truly call home.

Before

After

Currin Footer